Dry inside, whatever it is doing out there
Leaks found and fixed, roofs replaced when they have had enough, and photographs of what we found up there so you can see it for yourself.
Photo: Ryan Stephens / PexelsPhotographs from up there
You see what we saw before you decide anything.
A written quote
Itemised, with what is included and what would be extra if we find worse underneath.
Good to know
- 01
Photographs from up there
You see what we saw before you decide anything.
- 02
A written quote
Itemised, with what is included and what would be extra if we find worse underneath.
- 03
No doorstep sales
We do not knock on doors, and we do not price on the spot to catch you out.
- 04
Scaffold where it is needed
Safety is not a line we save money on, and nor is your gutter.
What we do
- 01Leaks
- Found — which is most of the work — then fixed and checked in the rain if we can.
- 02Re-roofing
- Stripped back, membrane and battens renewed, and recovered, with the timber checked underneath.
- 03Tiles and slates
- Slipped, cracked or missing, replaced to match what is there.
- 04Ridge and verge
- Re-bedded or dry-fixed, which is where half of a windy night's damage starts.
- 05Flat roofs
- Repaired or recovered in felt or membrane that lasts, not the cheapest roll on the shelf.
- 06Chimneys and flashings
- Repointed, re-flashed and sealed — where most old leaks actually come from.
- 07Sheet metal work
- Valleys, flashings, cappings and anything the rain runs along rather than off.
- 08Gutters and downpipes
- Cleared, repaired and replaced, and set to actually fall the right way.
- 09Fascias and soffits
- Replaced where they have gone, so the roof edge stops rotting.
- 10Roof timbers
- Rafters and battens repaired or replaced where the damp got there first.
- 11Loft insulation and ventilation
- Warm below, ventilated above, so the roof is not damp from the inside.
- 12Inspections
- A written report with photographs, for buyers, sellers and insurance.
How a roof job goes
A roof is inspected before it is priced, and photographed before it is covered.
- 01
Inspection
- 02
Quote
- 03
Safe site
- 04
The work
- 05
Sign-off
Started when they said, finished when they said, and cost what they said. I have used builders for thirty years and that has happened once.
Roofs we have done
Before, during and after — including a few of the things we found under the tiles.
Photo: Jan van der Wolf / Pexels01 / 04
Photo: Jan van der Wolf / Pexels02 / 04
Photo: Jiri Ikonomidis / Pexels03 / 04
Photo: HONG SON / Pexels04 / 04
The firm
- 0118+Years working
- 023 daysTo a written quote
- 0310 yrGuarantee on structural work
- 040Subcontractors you have not met
Water coming in?
Ring us. We will tell you what to do now and get a cover on it as soon as the weather allows.