Our team

The businessRoofs, honestly assessed

A lot of roofs that get replaced did not need to be, and a lot of leaks that get patched needed more than a patch. The difference is somebody going up and looking properly before quoting.

We will tell you when a repair buys you five years and when it buys you five months, and let you choose with the facts.

Photo: Jan van der Wolf / Pexels

Before winter

Clear the gutters and look at the roof from the garden with a pair of binoculars: slipped tiles, green streaks and daylight in the loft are the three things worth ringing about.

Small repairs in September cost a fraction of what the same problem costs in February, when everybody is ringing at once.

How a roof job goes

A roof is inspected before it is priced, and photographed before it is covered.

  1. 01

    Inspection

    We get up there and photograph what we find, inside the loft as well as outside.
  2. 02

    Quote

    The repair, or the replacement, and why — with the photographs beside it.
  3. 03

    Safe site

    Scaffold or access set up, the house sheeted, and the garden protected.
  4. 04

    The work

    Stripped, checked, recovered, and made watertight at the end of each day.
  5. 05

    Sign-off

    Photographed again, gutters cleared, and everything taken away.

Your basket

Your basket is empty.

Roofing Look 1Look 2Look 3 Ready-made · €100 ($119) Македонски All ready-made sites Start with this look