Who we are

The businessRoofs, honestly assessed

A lot of roofs that get replaced did not need to be, and a lot of leaks that get patched needed more than a patch. The difference is somebody going up and looking properly before quoting.

We will tell you when a repair buys you five years and when it buys you five months, and let you choose with the facts.

Photo: Gundula Vogel / PexelsPhoto: Ryan Stephens / PexelsPhoto: Ryan Stephens / Pexels

Before winter

Clear the gutters and look at the roof from the garden with a pair of binoculars: slipped tiles, green streaks and daylight in the loft are the three things worth ringing about.

Small repairs in September cost a fraction of what the same problem costs in February, when everybody is ringing at once.

How a roof job goes

A roof is inspected before it is priced, and photographed before it is covered.

  1. Step 1

    Inspection

    We get up there and photograph what we find, inside the loft as well as outside.

  2. Step 2

    Quote

    The repair, or the replacement, and why — with the photographs beside it.

  3. Step 3

    Safe site

    Scaffold or access set up, the house sheeted, and the garden protected.

  4. Step 4

    The work

    Stripped, checked, recovered, and made watertight at the end of each day.

  5. Step 5

    Sign-off

    Photographed again, gutters cleared, and everything taken away.

Your basket

Your basket is empty.

Roofing Look 1Look 2Look 3 Ready-made · €100 ($119) Македонски All ready-made sites Start with this look